✦ High Court of India · 20 Feb 2025

BIGWORKS TECHNOLOGIES PRIVATE LIMITED v. The State of Telangana

Case Details High Court of India · 20 Feb 2025
Court
High Court of India
Decided
20 Feb 2025
Bench
Not available
Length
1,358 words

Petition under Article 226 of the Constitution of lndia praying that in the circumstances stated in the affidavit filed therewith, the High Court may be pleased to issue writ order or direction more particularly one in the nature of WRIT OF MANDAMUS directing the respondents 2 to 7 to provide electricity connection SNos. Non-Domestic load of each 30KW, and 1No. Non-Domestic load of each 5KW, thus making total load of 1 60KW Connection to the Residential Building, in Plot No.14, H.No.1-89/4/14, in Survey Nos.31 to 36, total admeasuring 680 Sq Yards, situated at Madhapur (V), Serilingampally (M), Under GHMC, Ranr;a Reddy District, T.S., bounded by North: House No.1-Bg/A/9 on Plot No.9 South: 40' Wide Road East: 40' Wide Road West: plot No.13. without insisting upon occupancy certificate from the Bth respondent by holding that the refusal to provide electricity connection to the above referred premises is illegal and arbitrary. lA NO: 1 OF 2025 Petition underr Section 151 cPC praying that in the circumstances stated in the affidavit filed in support of the petition, the High court may be pleased to direct the respondents 2 to 7 to provide electricity connection 5Nos. Non- Domestic load of each 30KW, and 1No. Non-Domestic load of each SKW, thus making total load of 160KW connection to the Residential Building, in plot No.14, H.No.1-BglAl14, in Survey Nos.3.1 to 36, total adnreasuring 6g0 Sq yards, situated at [Vladhapur (V), Seritingampally (M), Under GHMC. Ranga Reddy District, T.S., bounJed by North: House No..1-Bg /Alg on plot No.g; South: 40' Wide Road; East: 40' Wide Road; West: plot No..l3. Without insisting upon occupancy certificate from the Bth respondent pending disposal of miin writ petition and may deem fit and proper in the circumstance of the case. Counsel for the Petitioner: SRI THAKUR ROOPA SINGH Courisel for the Respondent No.1: ASST. Gp FOR ENERGY Counsel for the Respondent No.2 to 7: SRI N. SREEDHAR REDDy, SC FOR TGSPDCL Counsel for the Respondent No.8: SRI G. MADHUSUDHAN REDDy, SC FOR GHMC The Court made the following: ORDER HON'BLE MRS JUSTICE SUREPALLI NANDA WRIT PETITION No.S1O5 of 2025 ORDER: Heard Smt. Thakur Roopa Singh, learned counsel appearing on behalf of the petitioner, learned Assistant Government Pteader for Energy, appearing on behalf of respondent No.1, Sri N. Sreedhar Reddy, learned Standing Counsel appearing on behalf of respondent Nos.2 to 7 and Sri G. Madhusudhan Reddy, learned Standing Counsel for Greater Hyderabad Municipal Corporation appearing on behalf of resPondent No.8.

2. The petitioner approached the Court seeking prayer as under: "...to issue writ, order or direction more particularly one in the nature of WRIT OF MANDAMUS directing the respondents 2 to 7 to provide electricity connectibn sNos Non-Domestic load of each 30KW, and 1No' Non- Domestic load of each sKW, thus making total load of 160KW Connection to the Residential Building, in Plot No. 14, H. No. 189/A/14, in Survey Nos. 31 to 36, total admeasuring 680 Sq Yards situated at Madhapur (V), Serilingampally (M) under GHMC, Ranga Reddy District, Telangana State, bounded by North: House No' 1- BglA/g on Plot No.9; South: 40' Wide Road; East: 40' 2 wP 5105 2025 Wide Rcrad; West: Plot No 13. Without insistinq upon occupancy certificate from the Bth responclent by holding that the refusal to provide electricity connection to the above referred premises is illegal and arbitrary and pass...".

3. It is the specific case of the petitioner that, the petitioner applied for release of electricity Supply for 5 Nos. Non-Domestic load of each 30KW and 1 No. Non-Domestic load of each 5 KW, thus making total load of 160 KW to the Resiclential Building in Plot No.14, H.No.1-89/A/14, in Survey Nos.31 to 36, total admeasuring 680 Sq. Yards, situated at Madhapur Village, Serilingampally (M), under GHMC, Ranga Reddy District, Telangana Sterte and in response to the said application, the 3d respondent addressed a letter dated 24.12.2024 to the petitioner to pay charges of Rs.6,60,253/- and accordingly petitioner paid the said amount but the respondents denied to provide electricity. connection stating that the petitioner must prcduce occupancy certificate frorn the Bth respondent. Aggrieved by the said action of the respondents, the present writ petition is filed.

4. Learned counsel appearing on behalf of the petitioner submits that the writ petition could be disposed of directing the 3 wP 5105 2025 respondents 2 to 7 to consider petitioner's application and pass appropriate orders as per rules in force. ,.5. Learned Standing Counsel appearing on behalf of the respondents 2 to 7 does not dispute the said submission made by the learned counsel appearing on behalf of the petitioner.

6. Taking into consideration the facts and circumstances of the case and the submissions made by both the learned counsel on record, the writ petition is disposed of directing the respondent Nos. 2 to 7 to I I consider and pass appropriate orders as per rules in force and in accordance to law, on petitioner's application dated 2L.O2.2O23 seeking electricity connection for release of electricity supply for 5 Nos. Non-Domestic load of each 3OKW and 1 No. Non-Domestic load of each 5 KW, thus making total load of 160 KW to the subject Residential Building in Plot No.l4, H.No.1-89lA/14,in Survey Nos.31 to 36, total admeasuring 680 Sq. Yards, situated at Madhapur Village, Serilingampally (M), under GHMC' Ranga Reddy District, Telangana State, within a period of one (O1) week from the date of receipt of a copy of this order duly considering the permission vide Permit I I l \ To, 4 wP 5105 2025 c BP, dated 22.05.2023 issued No. 1496lGH Mc / SLP / 2023- by Zonal Commissioner, Serilingampally Zone, GHMC, Hyderabad in favour of the petitioner. However, there shall be no order as to casts. The miscellaneous applications, if any pending, shall stand closed //TRUE COPY// SD/.MOHD. ISMAIL ASSI STANT REGISTRA R N CTION OFFICER

1. The Principa Secretary power and Energy Department The State of - r9tangana, Secretarlat, Hyderabad_500022. 2. The chairman and Manag-ing Director The southern power Distribution Company of fetangana Compound. l-JVderabad 500063. ;Slqt^e^Ltd, having its Coiporate otice ai'O_t-_S-0, Vint Hyderabad Hyderabad Banjarahills

3. Chief General Manaoer Commercial Mint Compouncl, T G S p DC L, 4. The Suoerintendino Enqineer, / operation/Banjarahiirs circre TGSpDC L, 5. The Divisional Engineer/Operation, / Banjarahills Division TGSp DC L, 6. The Assistanl. Divisional Engineer, / Operation/ Jublir:hills Subr _ [iyisi6n TGSP DCL. Hvderabad 7. The Assistanl 'Enoineer 8. fhe.C_ommissioner, The Greater Hyderabad Municipal Corporation, Near 9.- 9ne CC to sRt THAKURROo_PA_S_|NGH. Advocate topucl '19 9n" CC to SRt N. SREEDHAR BFpD_yr SC ioiiGspocl tbpuct 11 Qne CC to sFit G. TVADH_U^S^U.DI]^N BEDDV,-Sciol. onvcloFubt 12.Two CCs to GP FOR ENERGY, High Court tdr tf,e S:ate of fbfang#a. lOUft 13.Two CD Copir-.s t /, sE op / GHyD North/ AE rvradhapur, rGSp DC L, Tank Bund, Hvderabad Hyderabad BN GJP ' : HIGH COURT DATED:2010212025 I I ORDER WP.No.5105 of 2025 gE STA 14, 1 o q t t, a< t B 4 ',tAR 2[25 o * De i,,ti CP DISPOSING OF THE WRIT PETITION WITHOUT COSTS o\ I I a , I i