✦ Supreme Court of India

SRIDEVI DATLA v. UNION OF INDIA & Ors.

Case at a glance

Key paragraphs

  • Para 1515. In Jitendra Singh v. Ministry of Environment & Others8 the narrow, but important question considered was whether a state could alienate publicly available resources like ponds. This court held that that such transfer or alienation was impermissible. In Hanuman Laxman Aroskar v. Union of…
  • Para 2121. Other decisions14 have followed the same reasoning. It is also noticeable that there is no indication in the NGT Act that Section 10 of the General Clauses Act cannot be applied. It is therefore, held that the provision applies proprio vigore to all appeals…

Judgment

can broadly be said to be universally accepted is that in principle, the applicant must display bona fides, should not have been negligent, and the delay occasioned should not be such that condoning it would seriously prejudice the other party. Keeping these principles in mind, it is relevant to consider whether the NGT’s refusal to exercise discretion, in the facts and circumstances of this case, was erroneous. The court is conscious of the fact that exercise of discretion, per se, is a fact dependent one, and considerable latitude should be given to the court or tribunal of the first instance, in the performance of that task. Nevertheless, as decided, cases and judgments have shown that the exercise of discretion does at times, call for appellate scrutiny by this court. This is one such. The appellant pleaded that since the documentation attendant to the clearance granted to the Project Applicant was voluminous, and expert as well as professional legal advice of the kind necessary to approach the NGT was not available in the State of Andhra Pradesh, the procuring of relevant documents, and correspondence with counsel in Delhi and drafting of the appeal entailed some delay. This court is of the opinion that there is merit in appellant argument. [Paras 27 and 28][297-F-H; 298-A-B] Smt. Padmabati Mohapatra v. Union of India (2013) SCC OnLine NGT 2177; Rambir Narhargir Gosai v. Prabhakar Bhaskar Gadhaway AIR 1955 Nag 300; Save Mon Region Federation v. Union of India (2013) SCC OnLine NGT 2511; H. Dohil Construction Company Private Limited v. Nahar Exports Limited (2015) 1 SCC 680 : [2014] 8 SCR 424; BRS Steels Private Limited v. State of Rajasthan (2012) 6 SCC 782 : [2012] 5 SCR 583; Jitendra Singh v. Ministry of Environment & Others (2019) SCC OnLine SC 1510; Hanuman Laxman Aroskar v. Union of India (2019) 15 SCC 401 : [2019] 5 SCR 916; Kaushalya Rani v Gopal Singh [1964] 4 SCR 982; Collector of Excise & Customs v. Hongo India (P) Ltd. (2009) 5 SCC 791 : [2009] 4 SCR 1197; Union of India v. Popular Construction Co. (2001) 8 SCC 470 : [2001] 3 Suppl. SCR 619; Patel Bros. v. State of Assam (2017) 2 SCC 350 : [2017] 1 SCR 95; H.H. Raja Harinder Singh v. S. Karnail Singh SRIDEVI DATLA v. UNION OF INDIA AND ORS. 285 [1957] SCR 208; Manohar Joshi v. Nitin Bhaurao Patil (1996) 1 SCC 169 : [1995] 6 Suppl. SCR 421; Mohd. Ayub v. State of U.P. (2009) 17 SCC 70 : [2009] 15 SCR 1095; G. Ramegowda v. Land Acquisition Officer (1988) 2 SCC 142 : [1988] 3 SCR 198; Esha Bhattacharjee v. Raghunathpur Nafar Academy (2013) 12 SCC 649 : [2013] 9 SCR 782; State of Nagaland v. Lipok Ao (2005) 3 SCC 752 : [2005] 3 SCR 108; New India Insurance Co. Ltd. v. Shanti Misra (1975) 2 SCC 840 : [1976] 2 SCR 266; N. Balakrishnan v. M. Krishnamurthy (1998) 7 SCC 23 : [1998] Suppl. SCR 403; State of Haryana v. Chandra Mani (1996) 3 SCC 132 : [1996] 1 SCR 1060; Tehsildar (LA) v. K.V. Ayisumma (1996) 10 SCC 634; Improvement Trust v. Ujagar Singh (2010) 6 SCC 786: [2010] 7 SCR 376; Maniben Devraj Shah v. Municipal Corpn. of Brihan Mumbai (2012) 5 SCC 157 – referred to. Case Law Reference [2014] 8 SCR 424 [2012] 5 SCR 583 [2019] 5 SCR 916 [1964] 4 SCR 982 [2009] 4 SCR 1197 referred to referred to referred to referred to referred to [2001] 3 Suppl. SCR 619 referred to [2017] 1 SCR 95 [1957] SCR 208 referred to followed [1995] 6 Suppl. SCR 421 referred to [2009] 15 SCR 1095 [1988] 3 SCR 198 [2013] 9 SCR 782 [2005] 3 SCR 108 [1976] 2 SCR 266 referred to referred to referred to referred to referred to Para 11 Para 11 Para 15 Para 18 Para 18 Para 18 Para 18 Para 20 Para 21 Para 22 Para 22 Para 24 Para 24 Para 24 A B C D E F G H 286 SUPREME COURT REPORTS [2021] 13 S.C.R. A [1998] Suppl. SCR 403 referred to [1996] 1 SCR 1060 (1996) 10 SCC 634 [2010] 7 SCR 376 B (2012) 5 SCC 157 referred to referred to referred to referred to Para 24 Para 24 Para 24 Para 24 Para 26 C D E F G CIVIL APPELLATE JURISDICTION: Civil Appeal No. 3136 of 2020. From the Judgment and Order dated 31.07.2020 of the National Green Tribunal, Southern Zone Bench at Chennai in M.A. No. 231 of 2017 in Appeal Nos. 18 of 2020 (SZ). K. M. Natrajan, ASG, Ms. Anitha Shenoy, Atmaram Nadkarni, Mukul Rohatgi, Sr. Adv., Ms. Srishti Agnihotri, Ms. Kanika Sood, Ms. Sanjana Grace Thomas, Ms. Anmol Gupta, Gurmeet Singh Makker, Kanu Agrawal, Vatsal Joshi, Arup Banerjee, Varun Verma, Mahesh Agarwal, M. S. Ananth, Anirudh Bhatia, E. C. Agrawala, Advs. for the appearing parties. The Judgment of the Court was delivered by S. RAVINDRA BHAT, J.

#1. The appellant is aggrieved by an order of the National Green Tribunal (hereafter referred to as “the NGT”1) and has, therefore, approached this Court under Section 22 of the NGT Act. The NGT rejected her appeal, preferred to it against the environmental clearance for construction of the Greenfield International Airport, Bhogapuram, Vishakapatnam, which had been sought for by the fifth respondent.

#2. The facts are simple: the fifth respondent (hereafter called “the Project Applicant”) proposed the construction of a new Greenfield international airport. As was required by law and extant statutory notifications, it applied to the Ministry of Environment, Forests and Climate Change (hereinafter, the “MoEF”) to seek environmental clearance. The MoEF, after following the prescribed procedure, which included ascertaining the views and objections of the concerned parties, the general public etc, indicated its approval by an order dated 14.08.2017. In terms of Section 19 of the NGT Act, the approval was posted on the H 1 Dated 31.07.2020 SRIDEVI DATLA v. UNION OF INDIA AND ORS. [S. RAVINDRA BHAT, J.] 287 website of the MoEF on 14.08.2017. Concededly, the Project Applicant published the approval in an English daily on 13.09.2017. A

#3. The appellant preferred her appeal to the NGT on 13.11.2017. Along with the appeal, she preferred an application for condonation of delay in approaching the NGT, given the stipulation of Section 19 that the appeal had to be preferred within 30 days from the date of communication of the order impugned. She explained that since the clearance and related documents were voluminous and the matter required some technical expertise, requiring the papers to be forwarded to experts and lawyers in Delhi, and the inter se communication delay, the NGT needed to condone the delay, in the interests of justice. After considering the submissions made by the appellant as well as the Project Applicant, which opposed the application for condonation of delay, the NGT, by its impugned order, rejected the appellant’s application and consequently the appeal as well.

#4. The appellant’s arguments before this Court are mainly twofold: that the requirement of Section 16 is to “communicate the order to the concerned parties as well as the public and that a meaningful interpretation should be given to the provision”. It was emphasised in this context that communication means not merely the publication on the Central Government’s website, but also dissemination of the news or the decision to the affected parties. Learned senior counsel for the appellant – Ms. Anitha Shenoy, in this context, relied upon the terms contained in the environmental clearance/approval given by the MoEF, especially those which obliged the Project Applicant to intimate the decision in dailies having local circulation in the vernacular. She also relied upon the stipulations in the environmental clearance (“EC”) which prescribed that the successful project applicant had to, in continuation to so publishing the decision or intimation in local newspapers, also ensure that the decision was forwarded to local communities through the Panchayats etc. for dissemination.

#5. It was pointed out that the object of these conditions should be construed as part of a larger scheme of the Act to communicate every decision. The appellant argued that if a contrary interpretation were to be accepted, the appeal given by the statute would be meaningless as most often, large projects which involve either displacement of people or which affect habitats and have the tendency to damage or at least cause significant adverse impact upon the environment would not be B C D E F G H 288 SUPREME COURT REPORTS [2021] 13 S.C.R. A considered on its merits by the NGT since people and neighbourhoods cannot be presumed to have knowledge of deliberations in New Delhi. B C D E F G

#6. It was also argued on behalf of the appellant that in the circumstances of the present case, at least the appeal could not be said to be time barred. It was argued that the date for reckoning (limitation) is from 14.08.2017, when the MoEF uploaded the decision on its website. The ninety-day period within which appeal was to be filed, expired on 12.11.2017, which was a Sunday. It was submitted that under Section 10 of the General Clauses Act, if any period prescribed ends on a Sunday or a day on which the Court or the Tribunal does not function, the next day should be considered as the terminus quo in point of time. Consequently, it was submitted that the appeal should be considered as within time and should have been entertained on merits.

#7. Lastly, it was argued that the NGT’s opinion that sufficient cause was not shown while seeking condonation of delay is erroneous. Learned counsel highlighted that any proposal as well as clearances where voluminous documentation is involved, or if any individual or entity is aggrieved, or adversely affected, the only remedy provided is by way of an appeal. To substantiate the grounds of appeal, it would be essential that in many instances, expert advice is obtained based on which the grounds of appeal can be prepared and urged. If the issue were to be considered in this perspective, the explanation provided by the appellant in her application seeking condonation of delay could not be considered unreasonable and in fact amounts to sufficient cause. Learned counsel relied upon a previous order of the NGT in Smt. Padmabati Mohapatra v. Union of India2. Reliance was also placed on the judgment of the Nagpur High Court, reported as Rambir Narhargir Gosai v. Prabhakar Bhaskar Gadhaway.3

#8. On behalf of the Union of India, the ASG, Mr. K.M. Natraj argued that the impugned order does not require to be disturbed. He pointed out that the impugned order had noticed that the appellant made no complaint that the MoEF had put up the decision to grant environmental clearance on its website on 14.08.2017 or that having uploaded the decision it could not be viewed publicly in an uninterrupted manner. He further submitted that the finding that the first date when the decision was communicated by the MoEF on its website is determinative for the 2 2013 SCC OnLine NGT 2177 3 AIR 1955 Nag 300 H SRIDEVI DATLA v. UNION OF INDIA AND ORS. [S. RAVINDRA BHAT, J.] 289 purpose of reckoning limitation rather than any other later point in time. It was further emphasised on behalf of the UOI that the need to publish environmental clearances under the Environment Impact Notification 2006, framed under the Environment Protection Act, 1986 is now known to all. The proposal of the Project Applicant clearly fell within the sweep of the Environment Impact Notification in Item No.7(a) to the Schedule (to the notification).

#9. It was submitted on behalf of the UOI that in terms of the Environment Impact Assessment Notification, 2006, the clearance had to be published within seven days from the date of uploading. The publication of Environment Clearance dated 14.08.2017 was done on 21.08.2017. Thus, the appellant’s plea that she came to know of the environmental clearance on 24.08.2017 is baseless. The learned ASG relied upon a decision of the NGT in Save Mon Region Federation v. Union of India4 in this regard.

#10. Learned ASG lastly argued that by virtue of Section 33 of the Act, the provisions of all other laws stand overridden and consequently, the question of extending the period of limitation by reference to Section 5 of the Limitation Act would not arise. He further urged that the period of limitation prescribed is actually 30 days for the filing of an appeal, and that further period of 60 days is only by way of acceptance of application for condonation of delay. Thus, no appeal is maintainable after the expiry of 90 days. It is pointed out that in the present case, the 90 day period in fact ended a day prior to the filing of the appeal; it was, therefore, clearly time-barred.

#11. Mr. Mukul Rohatgi, learned senior counsel appearing for the Project Applicant supported the submissions of the Union and argued that the concerned Project Applicant, i.e. M/s Bhogapuram International Airport Corporation Ltd., has been conceived in public interest and in replacement of the existing Vishakhapatnam Airport which is primarily a defence airport. Learned counsel relied upon the decision of this Court in H. Dohil Construction Company Private Limited v. Nahar Exports Limited5 to the effect that any aggrieved litigant should be vigilant in the exercise of his rights and that he cannot claim the exercise of discretion for condoning any delay as a matter of right. Reliance was also placed upon the decision in BRS Steels Private Limited v. State of Rajasthan6. 4 2013 SCC OnLine NGT 2511 5 (2015) 1SCC 680 6 (2012) 6 SCC 782 A B C D E F G H 290 SUPREME COURT REPORTS [2021] 13 S.C.R. A B C D E F G In this regard, it was submitted that the appeal before this Court which purports to be under Section 22 of the Act is confined to the grounds specified under Section 100 of the CPC, which is only if the Court is satisfied that the case involves a substantial question of law.

#12. Lastly, it was submitted by learned senior counsel that the NGT Act correctly surmised in the circumstances of the case that the appellant had adopted a casual approach and did not believe the contents of the application for condonation of delay. Learned counsel in this context argued that the appellant is an interested person in the sense that her lands had been notified for acquisition and was therefore not uninformed or incapable of receiving appropriate legal advice. Analysis and Findings

#13. The relevant provision of the Act, i.e. Section 167 reads as follows: “16. Tribunal to have appellate jurisdiction. -Any person aggrieved by,- (a) an order or decision, made, on or after the commencement of the National Green Tribunal Act, 2010, by the appellate authority under section 28 of the Water (Prevention and Control of Pollution) Act, 1974 (6 of 1974); (b) an order passed, on or after the commencement of the National Green Tribunal Act, 2010, by the State Government under section 29 of the Water (Prevention and Control of Pollution) Act, 1974 (6 of 1974); (c) directions issued, on or after the commencement of the National Green Tribunal Act, 2010, by a Board, under section 33A of the Water (Prevention and Control of Pollution) Act, 1974 (6 of 1974); (d) an order or decision made, on or after the commencement of the National Green Tribunal Act, 2010, by the appellate authority under section 13 of the Water (Prevention and Control of Pollution) Cess Act, 1977 (36 of 1977); (e) an order or decision made, on or after the commencement of the National Green Tribunal Act, 2010, by the State H 7 Of the NGT Act SRIDEVI DATLA v. UNION OF INDIA AND ORS. [S. RAVINDRA BHAT, J.] 291 Government or other authority under section 2 of the Forest (Conservation) Act, 1980 (69 of 1980); A (f) an order or decision, made, on or after the commencement of the National Green Tribunal Act, 2010, by the Appellate Authority under section 31 of the Air (Prevention and Control of Pollution) Act, 1981 (14 of 1981); (g) any direction issued, on or after the commencement of the National Green Tribunal Act, 2010, under section 5 of the Environment (Protection) Act, 1986 (29 of 1986); (h) an order made, on or after the commencement of the National Green Tribunal Act, 2010, granting environmental clearance in the area in which any industries, operations or processes or class of industries, operations and processes shall not be carried out or shall be carried out subject to certain safeguards under the Environment (Protection) Act, 1986 (29 of 1986); (i) an order made, on or after the commencement of the National Green Tribunal Act, 2010, refusing to grant environmental clearance for carrying out any activity or operation or process under the Environment (Protection) Act, 1986 (29 of 1986); (j) any determination of benefit sharing or order made, on or after the commencement of the National Green Tribunal Act, 2010, by the National Biodiversity Authority or a State Biodiversity Board under the provisions of the Biological Diversity Act, 2002 (18 of 2003), may, within a period of thirty days from the date on which the order or decision or direction or determination is communicated to him, prefer an appeal to the Tribunal; Provided that the Tribunal may, if it is satisfied that the appellant was prevented by sufficient cause from filing the appeal within the said period, allow it to be filed under this section within a further period not exceeding sixty days.”

#14. Environmental disputes are complicated and entail expertise in diverse fields (such as ecology, chemistry, biology, economics, administration, management, law etc.) for their determination in an B C D E F G H 292 SUPREME COURT REPORTS [2021] 13 S.C.R. A B C D E F G effective and speedy fashion, that is not possible within the regular judicial and administrative set up in India. In other words, environmental disputes relating to forests, biodiversity, air and water are complicated in nature; resolving and expeditiously disposing of these cases is not possible without a separate special court. Environmental courts or tribunals have been a long-standing demand for other reasons too. For effective prevention and control of environmental protection, there was an urgent need for a separate environmental court or tribunal to adjudicate without much delay. India is a party to the United Nations Conference on the Human Environment (known as the Stockholm Conference), 1972 where it made commitments relating to safeguarding of natural resources and developing international law, and to provide compensation to victims of pollution and other environmental degradation. India is also a signatory to the Rio Declaration adopted at the United Nations Conference on Environment and Development at Rio de Janeiro in 1992. The Rio Declaration states that participating states must make suitable environmental legislation regarding effective access to the people, to judicial and administrative proceedings, including remedies. The Law Commission’s 186th report recommended that the Union government should establish and constitute separate Environmental Courts in each state, to deal with complex, specialised issues concerning the environment. It was in this background that Parliament enacted the NGT Act. The Act amends various other enactments and adds provisions to them, for appeal before the NGT. These are incorporated in Section 33-B of The Water (Prevention and Control of Pollution) Act, 1974; Section 13-A of The Water (Prevention and Control of Pollution) Cess Act, 1977; Section 2-A of The Forest (Conservation) Act, 1980; Section 31-B of The Air (Prevention and Control of Pollution) Act, 1981; Section 5-A in the Environment (Protection) Act, 1986 and Section 52-A in the Biological Diversity Act, 2002.

#15. In Jitendra Singh v. Ministry of Environment & Others8 the narrow, but important question considered was whether a state could alienate publicly available resources like ponds. This court held that that such transfer or alienation was impermissible. In Hanuman Laxman Aroskar v. Union of India9 this court held that the NGT is under an obligation to consider issues as an expert body, and apply the principle of sustainable development, in adjudicating environmental issues, especially 8 2019 SCC OnLine SC 1510 9 (2019) 15 SCC 401 H SRIDEVI DATLA v. UNION OF INDIA AND ORS. [S. RAVINDRA BHAT, J.] 293 while considering the validity of grant of clearance to large projects under the Environment Protection Act. It was held that the NGT Act: A “provides for the constitution of a tribunal consisting both of judicial and expert members. The mix of judicial and technical members envisaged by the statute is for the reason that the Tribunal is called upon to consider questions which involve the application and assessment of science and its interface with the environment.”

#16. The court noted that to be a member of the NGT, the individual had to possess specified academic qualifications, including a master’s degree in science with a doctorate in engineering or technology, with prescribed experience in certain domains. To be an administrative member, the individual should possess fifteen years’ administrative experience including experience of five years in dealing with environmental matters in the Central or State Government or in a reputed national or state level institution. The court proceeded to hold in Hanuman Laxman Aroskar (supra), that the grant of environmental clearance to a greenfield airport in Goa did not receive proper merits review by the NGT.

#17. Having regard to these decisions, and given the nature of jurisdiction which the NGT has been invested with, the substantial questions of law that arise in the present case, are whether the approach to the issue of limitation by the NGT was correct, and whether on a correct interpretation of law, the appeal under Section 16 was filed within the 90 days period, in the facts of this case. Applicability of General Clauses Act

#18. There can be no dispute that the period of limitation set out in a special law, which provides for remedies and appeals, has to be construed in its terms and without reference to the Limitation Act, if it contains specific provisions delineating the time or period within which applications or appeals can be preferred, and confines the consideration of applications for condoning the delay to a specific number of days. Undoubtedly, in such cases, the Limitation Act would be inapplicable.10 B C D E F G 10 That provision is as follows:

#29. Savings.—(1) Nothing in this Act shall affect Section 25 of the Indian Contract Act, 1872 (9 of 1872). (2) Where any special or local law prescribes for any suit, appeal or application a period of limitation different from the period prescribed by the Schedule, the provisions H 294 SUPREME COURT REPORTS [2021] 13 S.C.R. A B C D E F G There are several previous judgments of this court holding that where periods of limitation are prescribed under special laws, appeals that exceed the period granted and are within the extended period of limitation in the special law, can be entertained at the discretion of the tribunal, or court concerned and the Limitation Act would not apply upon expiry of such extended period.11 This court holds that there is merit in the contention of the Union that the provisions of the Limitation Act are inapplicable. This is, however, not dispositive of the issue; the next question is whether there is merit in the appellant’s argument that the NGT should have considered the issue of whether the appeal was filed within the extended period prescribed under the proviso to Section 16, i.e. within sixty days after the expiration of the initial 30 day period, required in the main provision.

#19. The appellant argues that since there is no indication to the contrary; the appeal is to be considered as having been filed within the extended period of 60 days, since the last (of the 60 days) was a Sunday (12.07.2020). The appellant relied on Section 10 of the General Clauses Act, for this purpose. The respondents, notably the Union, opposed this argument.

#20. Section 10 of the General Clauses Act, 189712 stipulates that when the last date for doing something falls on a public holiday, the act “shall be considered as done..” if it “is done or taken on the next day afterwards on which the Court or office is open”. This provision of Section 3 shall apply as if such period were the period prescribed by the Schedule and for the purpose of determining any period of limitation prescribed for any suit, appeal or application by any special or local law, the provisions contained in Sections 4 to 24 (inclusive) shall apply only insofar as, and to the extent to which, they are not expressly excluded by such special or local law.” 11 Kaushalya Rani v Gopal Singh 1964 (4) SCR 982; Collector of Excise & Customs v. Hongo India (P) Ltd. (2009) 5 SCC 791; Union of India v. Popular Construction Co. (2001) 8 SCC 470; Patel Bros. v. State of Assam (2017) 2 SCC 350 12 “10. Computation of time.— (1) Where, by any Central Act or Regulation made after the commencement of this Act, any act or proceeding is directed or allowed to be done or taken in any Court or office on a certain day or within a prescribed period, then, if the Court or office is closed on that day or the last day of the prescribed period, the act or proceeding shall be considered as done or taken in due time if it is done or taken on the next day afterwards on which the Court or office is open: Provided that nothing in this section shall apply to any act or proceeding to which the Indian Limitation Act, 1877, applies. (2) This section applies also to all Central Acts and Regulations made on or H after the fourteenth day of January, 1887.” SRIDEVI DATLA v. UNION OF INDIA AND ORS. [S. RAVINDRA BHAT, J.] 295 applies to all Central Acts enacted after the said Act was brought into force. The scope of this provision was considered by this Court in H.H. Raja Harinder Singh v. S. Karnail Singh13 by a four judge Bench, which explained the object of Section 10 and held as under: “5. … Where, therefore, a period is prescribed for the performance of an act in a court or office, and that period expires on a holiday, then according to the section the act should be considered to have been done within that period, if it is done on the next day on which the court or office is open. For that section to apply, therefore, all that is requisite is that there should be a period prescribed, and that period should expire on a holiday.”

#21. Other decisions14 have followed the same reasoning. It is also noticeable that there is no indication in the NGT Act that Section 10 of the General Clauses Act cannot be applied. It is therefore, held that the provision applies proprio vigore to all appeals filed under the NGT Act. Approach of the court in considering the application for condonation of delay

#22. What constitutes “sufficient cause” in terms of Section 16 of the NGT Act? While it is unexceptionable for the Project Applicant to argue that the Limitation Act is per se inapplicable to proceedings under the NGT Act, given that the basic, and outer period of limitation for filing an appeal have been enacted, nevertheless, what constitutes sufficient cause, is left to the discretion of the tribunal. Here, the court discerns a surfeit of authority on what the term denotes, and the general approach of the court, in dealing with delay.

#23. In G. Ramegowda v. Land Acquisition Officer15, speaking for this court, Venkatachaliah, J summarized the position in the following terms: “14. The contours of the area of discretion of the courts in the matter of condonation of delays in filing appeals are set out in a number of pronouncements of this Court.

Precedent status how later indexed judgments have treated this case

No known negative treatment found in the Courts & Cases corpus.

This is a result about the indexed corpus, not a finding that the judgment remains good law. Coverage may be incomplete.

Why is this linked?

This is the original judgment text, reproduced from the public court record. Always verify it against the official record before relying on it in a filing — check it on Supreme Court of India or eCourts case status (search case no. Civil Appeal No. 3136 of 2020). ← Search more judgments